A job card should show eight things: the order and customer, the item and quantity, materials issued, each operation or stage, the machine and operator, start and end times, the quality check, and a final sign-off. Issue one job card for each order (or each batch of a large order), link it to the work order and the material issue, and close it only when QC has passed and the goods are ready to dispatch and invoice.
That's the short answer. Below is a sample format you can copy, plus how to actually use it on the shop floor so nothing goes missing between the store and the dispatch gate.
Job card vs work order: what's the difference?#
Many small factories use these two words for the same thing. It helps to keep them separate.
- Work order is the instruction. It says what to make, how many, and by when. It usually comes from a customer order or a stock plan.
- Job card is the record of the work. It travels with the material on the shop floor and shows what actually happened: who did which operation, on which machine, how long it took, how many pieces passed or were rejected.
Simple rule: the work order says what should happen. The job card says what did happen.
Example: a sheet-metal workshop in Faridabad gets an order for 500 MS brackets from a customer in Pune. The work order says "500 brackets, 2 mm MS sheet, powder coated, due 20th". The job card then follows those brackets through cutting, bending, welding, coating and packing.
What every job card should show#
Keep it to one page. If the operator can't fill it in under a minute per stage, they won't fill it in at all.
Header (filled when the card is issued)
- Job card number (one running series, no gaps)
- Work order number and customer order or PO reference
- Customer name
- Item name, drawing or part number, and revision
- Quantity to make and due date
- Date issued and issued by
Materials issued
- Material name and grade
- Quantity issued, with unit (kg, sheets, metres, nos)
- Batch or heat number, if you track it
- Store issue slip number and who received it
Operations or stages
- Each operation in order (cutting, bending, welding, and so on)
- Machine used
- Operator name
- Start and end time
- Quantity in, quantity OK, quantity rejected or reworked
Quality and sign-off
- In-process check after key stages
- Final QC result, with the checker's name and date
- Supervisor or approver sign-off
- Remarks: rejection reasons, rework, scrap
Closing
- Quantity finished and moved to dispatch or finished-goods store
- Leftover material returned to store
- Date closed
A sample job card format#
Here is how the Faridabad bracket job could look once filled in.
Job card JC-0412 | Work order WO-0388 | Customer PO: PNQ/2291 Customer: ABC Engineering, Pune | Item: MS Bracket, Drg BR-14 Rev B | Qty: 500 | Due: 20th Material issued: MS sheet 2 mm, 18 sheets, issue slip MI-0761, received by Ramesh
| Stage | Machine | Operator | Start | End | Qty in | OK | Rejected | Checked by |
|---|---|---|---|---|---|---|---|---|
| Cutting | Shearing M1 | Ramesh | 12th 09:30 | 12th 13:00 | 500 | 500 | 0 | Sunil |
| Bending | Press brake P2 | Imran | 12th 14:00 | 13th 11:00 | 500 | 494 | 6 | Sunil |
| Welding | MIG W1 | Ajay | 13th 11:30 | 14th 16:00 | 494 | 492 | 2 | Sunil |
| Powder coating | Booth C1 | Vendor/in-house | 15th | 16th | 492 | 490 | 2 | Sunil |
| Final QC and packing | – | Pooja | 17th 10:00 | 17th 15:00 | 490 | 490 | 0 | Sunil (QC) |
Final QC: passed, 490 nos. Short by 10 against the order. Approved by: Production head, 17th. Leftover: 1 sheet returned to store.
Notice what this tells you at a glance. You lost 10 pieces, mostly at bending. You're short on the order, so either you make 10 more or you tell the customer today, not on the 20th.
How to issue one job card per order#
- Start from the work order. No job card without a work order number. This stops "side jobs" that never get billed.
- Issue material against the job card. The store gives material only when the job card number is written on the issue slip. Now you know exactly what each order consumed.
- Let the card travel with the material. Paper cards go in a plastic sleeve on the trolley. If you use a phone or tablet, the supervisor updates each stage as it finishes.
- Split big orders into batches. For 5,000 pieces over two weeks, issue one card per batch (say 1,000 each) so you can see progress and find problems faster.
- Close the card only after QC and sign-off. The dispatch team should not pack anything that doesn't have a closed job card.
If part of the work goes outside, for example coating or plating at a job worker, note the outward and return quantities on the job card too. Goods sent to a job worker usually need a delivery challan under GST, so check the current rules with your CA.
Tracking work from raw material to dispatch#
When the job card is linked properly, every order has a clean chain:
Purchase order → material received → material issued (against job card) → operations → QC → finished goods → dispatch → invoice
This chain answers the questions owners ask every day:
- "Where is the Pune order?" Look at the last completed stage on the job card.
- "Why did this order cost more?" Compare material issued and hours on the card with your estimate.
- "Did we bill everything we made?" Every closed job card should match a dispatch and an invoice. A closed card with no invoice is money left on the table.
- "Which machine or operator has the most rejections?" Add up the rejected column across a month of cards.
A small weekly habit helps a lot: every Saturday, list all open job cards, the stage each is at, and its due date. Anything late gets a reason and a new date.
Common mistakes on the shop floor#
- Material not recorded. Store hands over sheets "for now" and the slip is written later, or never. Your stock goes wrong and the job cost is guessed.
- Missing QC sign-off. Parts move to packing because the truck is waiting. Then a rejection comes back from the customer and no one knows who checked it.
- Times filled in at the end of the day. Operators write "9 to 6" for everything. You lose the real picture of machine time.
- One card for many orders. Two customers' parts on one card means you can't trace either.
- Rejections without reasons. "6 rejected" is not enough. "6 rejected, bend angle out" tells you what to fix.
- Cards that never close. Half-done cards pile up in a drawer, and no one knows which orders are finished.
- No link to invoicing. Goods dispatched, but accounts hears about it a week later. Your GST invoice and your cash both get delayed.
Moving off paper and Excel#
Paper and Excel can work for five orders a week. Past that, cards get lost, Excel versions multiply, and the owner ends up calling the supervisor for every update.
If you want to move this onto the phone, Clyrix's Enterprise package for factories covers purchasing, vendors, work orders and job cards in one place. Tasks can have checkers and approvers, so the QC person checks and the production head approves from their phone, and WhatsApp updates tell the right people when a task or approval is waiting. Because quotes, GST invoices and payments sit in the same workspace, a finished order can move straight to billing. You can see what's included on the manufacturing page and try it with the 14-day free trial (no card needed) from the pricing page.
Whatever tool you use, the habit is what matters: one job card per order, material issued against it, every stage recorded, and nothing dispatched without QC sign-off.



